Bennett Architectural were awarded the sub-contract glazing works for the Exhibition Centre Liverpool (ECL).
An investment of £40 million, Exhibition Centre Liverpool consists of 8,100m² of space which is sub-divisible into three pillar-free exhibition halls and a brand new interconnected hotel with up to 200 bedrooms.
During construction of the ECL, which hosts up to 50 events a year, we installed Kawneer’s AA100 mullion-drained curtain walling and 451PT thermally-broken framing system, along with their AA720 HI tilturn windows.
the project was completed in just over 2 years, with it’s first event taking place in September 2015.
Rob Bennett, Sales Director, of Bennett Architectural commented,
“This project needed to be aesthetically pleasing but also meet stringent performance standards, so we worked hard with the architect’s team to create a solution that met all requirements and we are delighted to be working with ISG on this landmark scheme for Liverpool”
If you’d like to work with Bennett Architectural on your next construction project, visit our Contact page.
For further information on the construction of the ECL, read Kawneer’s Exhibition Centre Liverpool Case Study.
Read our testimonial from Denton Corker Marshall Architects below: